Skip to content
Strongrate Fiberglass Grating · Factory-Direct, home

Enter two received quotes in USD. All amounts stay in your browser until you carry the summary into a quote request. No exchange rates or import charges are supplied.

Use the same installed service area for both quotes. Quoted material area below includes purchased offcuts and surplus.

Quote 1

Additional USD costs for this entire quoted lot. Blank = unknown. Enter 0 only if included in the material price or confirmed not applicable. Count each cost once.

Quote 2

Additional USD costs for this entire quoted lot. Blank = unknown. Enter 0 only if included in the material price or confirmed not applicable. Count each cost once.

Review equivalent scope

Cost or scope review is incomplete. These subtotals do not establish the lowest comparable delivered cost.

Normalize the material price, then add the lot costs

For a whole-lot quote, use the quoted material amount. For a panel price, multiply by the whole panel count. For an area price, multiply by the quoted material area in the corresponding unit. Add each additional cost once for that entire lot. Divide the entered-cost subtotal by quoted material area to compare material coverage, or by the shared required service area to compare project spending.

Quoted material area includes all purchased material, including surplus and offcuts. It does not establish that the finished pieces fit the layout. Use the panel quantity calculator and grating weight calculator to prepare the schedule. Check exact products with the grating specification finder.

Resolve the differences behind the totals

  • Compare mesh or bar type, depth, resin, surface, load requirements, certifications and drawing revisions.
  • Record the quote date, validity, payment terms, Incoterm and named place. Confirm the actual delivery date and who pays for each transport stage.
  • Enter additional freight, cutting, clips, packing, import charges and final delivery only once. Put any other project cost in Other costs. Use zero for an included cost only after checking the source quote.
  • Use received USD quotes. Currency conversion and import charges require your own verified inputs; this calculator supplies neither exchange rates nor duty estimates.

The results are buyer-entered arithmetic, not Strongrate prices or binding delivered-cost quotes. Review the factory-direct ordering process and send the final scope through a quote request. Return to all grating planning tools to revise the specification or quantity.

Request a quote

Send the required specification, quantity schedule and delivery scope for a project quote.